Chaffee-Ward Corporation - Your number one source for water cleaning equipment, parts and repair


Company
Home
Service & Sales
Our Customers
Employment
Contact CW

Products
New Equipment
Parts List
Soap & Chemicals
Steam Jenny Parts
Reconditioned Equip.
Internet Specials
Order Form

Water Cleaning
Applications
Accessories
• Maintenance
Q & A

VISA, MC, AMEX Accepted


Maintenance Schedule

In order to minimize downtime for your water cleaning equipment, Chaffee-Ward recommends the following maintenance schedule. The procedures are based on hours of usage and are outlined in the tables below.

Heavy Duty Usage: 15+ Hours Per Week (industrial)
Medium Duty Usage: 8-14 Hours Per Week (light commercial)
Light Duty Usage: 2-4 Hours Per Week (residential)
Procedures Every 3 Months Every 6 Months Every 12 Months
Pump Oil Change
Check pump belts & pulleys
Inspect water strainers/cleaners
Check pump water volume
Check/test water nozzles
Check voltage/amperage draw
Inspection of all hoses
Inspection of electrical cables
Check for systems leaks
Inspect heating coil/combustion chamber
Oil Burner Inspection Tests
Replace fuel filter (if applicable)    
Replace burner nozzle (if applicable)    
Check fuel pump pressure
Check fuel tank
Check fuel system for leaks
Check solenoid valve operation
Gas Fired Inspection Tests
Check for gas system leaks
Check burner/pilot flames
Test gas valve/pilot assemblies
Gas pressure test

CW

Chaffee-Ward Corporation
PO Box 237 - 10838 Bodine Road, Clarence, New York 14031
Toll Free: 1-800-535-9919 - Phone: 716-759-8228 - Fax: 716-759-8482

Contact Form

www.chaffee-ward.com

This site © 2003-2008 Chaffee-Ward Corporation. Unauthorized duplication of any content is prohibited. Site Best Viewed @ 1024x768


  Chaffee-Ward Corporation - Phone:800-535-9919 - Fax:716-759-8482 - 10838 Bodine Road - Clarence, New York 14031-0237